Construction Updates:

Local construction causing delays ( SCROLL FOR LIST)

OSI High Pointe Clinic

2000px-Baustelle.svg

The primary driveway entrance to this clinic off Hudson Blvd N. is currently under construction. We recommend using the next driveway east of the main driveway, which enters into Park Dental High Pointe to access OSI in the High Pointe building.

___________________________________________________________________________________________________________________________________________________________________________

OSI High Point Clinic

HP

2000px-Baustelle.svg

Construction update for this clinic includes highway 94 being reduced to 2 lanes both directions from April 2016 until fall of 2017

___________________________________________________________________________________________________________________________________________________________________________

OSI Forest Lake Clinic

FL

2000px-Baustelle.svg

Construction update for this clinic includes highway 61 being reduced to a single lane from White Bear up through Hugo and Scandia.